Vega Oil FPSO

Navalimpianti developed the engineering for the conversion of the VLCC tanker Agip Sicilia into Vega Oil FPSO for the Vega Field in the Sicily Channel. The design included: feasibility, basic and detail design, including commissioning and start-up procedures for a total of about 110.000 hours of engineering developed in about 16 months. Navalimpianti moreover supplied […]

Read more »

Sloug FSO

Navalimpianti developed the engineering for the Agip Sardegna VLCC conversion into Sloug FSO for the Bouri Field in Sirti Gulf. The design, about 120.000 hours of engineering developed in about 18 months, has included basic & detail engineering, commissioning and start-up procedures. Navalimpianti moreover supplied for the same project also the Cargo pumps control system […]

Read more »